3.3 Deciding Test Route
The KPI DT acceptance route is the core route of RF optimization test routes. Its optimization is the core of RF optimization. The following tasks, such as parameter optimization and acceptance, are based on KPI DT acceptance route. The KPI DT acceptance route must cover major streets, important location, VIP, and VIC.
The DT route should cover all cells as possible. The initial test and final test must cover all cells. If time is enough, cover all streets in the planned area. Use the same DT route in every test to compare performances more accurately. Round-trip DT is performed if possible.
Consider actual factors like lanes and left-turn restriction while deciding test route.
3.4 Preparing Tools and Data
Prepare necessary software, hardware and various data (listed below), because the following test and analysis are based on them.
3.4.1 Preparing Software
Recommended software for RF optimization
No. | Software | Function | Remarks |
1 | Tems Investigation - Aquisition | DT | Above V8.0 |
2 | Tems Investigation – Route Analysis | Analyzing DT data and checking neighbor cells | Above V8.0 |
2 – best | Actix Software | Analyzing DT data and checking neighbor cells | Above GA10 |
3 | Genex Nastar NetAct – KPI browser | Analyzing performance, checking health, and locating problems | – |
4 | Mapinfo | Displaying maps and generating route data | – |
3.4.2 Preparing Hardware
Recommended hardware for RF optimization
No. | Device | Specification | Remarks |
1 | Scanner | PcTel SeeGul Scanner | – |
2 | Test terminal (and data card ) | SE K600, K800, Qualcomm, and so on | At least two test terminals. If there is HSDPA request use the data card |
3 | Laptop | >1.3Ghz/>1GB/>20G/4USB/COM/PRN | – |
4 | Vehicle mounted inverter | DC to AC, over 300W | – |
3.4.3 Preparing Data
Data to be collected before optimization
No. | Needed data | Whether is necessary | Remarks |
1 | List of engineering parameters | Yes | – |
2 | Map | Yes | By Mapinfo or in paper |
3 | KPI requirements | Yes | – |
4 | Network configuration parameters | Yes | – |
5 | Survey report | No | – |
6 | Single site verification checklist | No | – |
7 | Floor plan of the target buildings | Yes | For indoor test |