Types of Cable swapping
1)Complete Cross feeder(GSM or DCS)
2)Composite Swap(GSM or DCS)
3)GSM or DCS cable Swap
4)Wrong Antenna installation
1)Complete Cross feeder(GSM or DCS)
•Analysis
          Completely crossed feeder cable of two sectors.
          coverage area of the two adjacent cells or swapped.
2)Composite Swap(GSM or DCS)
• Analysis
         Feeder Cable of two or three sectors or partially swapped.
        Tx feeder Cable is correct Rx feeder cable is swapped.
        Tx feeder Cable Swapped Rx came cable are correct.
•Problem
        fluctuation in Rx level continually when we near to site.
 3)GSM-DCS Cable Swap
•Analysis
         GSM feeders or connected to DCS
4)Wrong Antenna installation
•Analysis
       Sub case of composite Swap and mostly in complex site.
         Wrong installation in inside the cabinet.
         Knowledge of TRX configuration will helpful to solve this problem.
•  Problem
           Lot of handover failure.
          Call drops due to missing neighbors.
Sector/Cable swap
Problem Due to Swap
Figure;1
figure : Problem Due to Swap
Figure 2;
Figure : Problem Due to Swap
Reason for Sector Swap and Wrong installation;
             Due to very huge and fast deployment sector swap and wrong installation is common.
The main reason is behind in hardware installation.
Antenna and feeders are installed at one time and BTS and other hardware are installed an power up at other time.
Here the responsibility of acceptance team comes who need to verify these type of problems very carefully in field.
 Case Study I ;
Pre-Drive
There was a sector swap between sector 2 and sector 3 in 900 band.
This can be categorized into “Complete Cross Feeder†.
But here No swap was found in complete cable trace from BTS to top of Antenna.
But sector was found inside the Cabinet cabling between TRx and Duplexer.
It Cause result:Â Handover Failure
Post Drive
Swap was removed by the help of BSS engineer and Rigger
The main reason is behind in hardware installation.
Antenna and feeders are installed at one time and BTS and other hardware are installed an power up at other time.
Here the responsibility of acceptance team comes who need to verify these type of problems very carefully in field.
 Case Study I ;
Pre-Drive
There was a sector swap between sector 2 and sector 3 in 900 band.
This can be categorized into “Complete Cross Feeder†.
But here No swap was found in complete cable trace from BTS to top of Antenna.
But sector was found inside the Cabinet cabling between TRx and Duplexer.
It Cause result:Â Handover Failure
Figure : Pre drive
Post Drive
Swap was removed by the help of BSS engineer and Rigger
Figure : Post Drive
Case study II
 Pre-Drive
In sector 2 GSM Feeder cable is connected to DCS duplexer and DCS Feeder Cable is connected to BTS Duplexer.This can be categorized into GSM/DCS Cable Swap.In this type there is no clear identification, But drive tester may observed .ProblemFrequent INTRA Handovers.
Handover failures.
Some times call drop due to Low Rx level even near to BTS.
 Post-Drive
 Example for Swapping
In sector 2 GSM Feeder cable is connected to DCS duplexer and DCS Feeder Cable is connected to BTS Duplexer.This can be categorized into GSM/DCS Cable Swap.In this type there is no clear identification, But drive tester may observed .ProblemFrequent INTRA Handovers.
Handover failures.
Some times call drop due to Low Rx level even near to BTS.
Figure : Pre Drive
 Post-Drive
Figure : Post Drive
 Example for Swapping
Figure : Examples of Swappping